New build snagging checklist: every room, every service, ready to print
Use this new build snagging checklist to inspect a new home room by room before completion and again after you move in. Start outside, work from top to bottom in each room, test every door, window, tap, socket and radiator, and write each fault on your snag list with its location, a photo and the trade that should fix it.

When to use the checklist
The best time is the pre-completion inspection: after the developer has served notice to complete and before legal completion. If your developer is registered with the New Homes Quality Code, they must give you the chance to do this inspection yourself or appoint a qualified inspector (see what is snagging for the detail). Book it in daylight and allow two to three hours for a typical house. Go back through the list again after a few weeks of living in the home, and once more before the second anniversary of completion, when the developer's after-sales period under the Code ends.
What to bring
- This checklist, printed, and a pen
- Phone with plenty of storage and battery for photos
- Torch, for cupboards, the loft and under sinks (not for judging wall finishes)
- Spirit level (a 600 mm one is enough)
- Tape measure
- Plug-in socket tester
- Phone charger or small lamp to test sockets if you have no tester
- Masking tape or low-tack stickers to mark snags for the trades
- Step ladder, if the developer allows you to use it on site
- Coin or marble to check floor falls in wet rooms
- Your plans and specification, to check what you were promised
Follow any safety instructions the developer gives you. The Code allows developers to refuse access to anyone who does not follow them.
Outside: walls and elevations
- Brickwork clean, no mortar smears, splashes of paint or render
- Mortar joints full and even; no gaps, especially under sills and around frames
- No cracked or chipped bricks, blocks or stone
- Render even, no cracks, no hollow-sounding patches
- Weep vents present above windows and doors where the design has them
- Air bricks clear, not blocked by soil, paving or render
- Damp proof course visible and not bridged by soil, paths or patios (typically 150 mm above ground)
- Cladding fixed, straight and undamaged
- Sealant around window and door frames continuous, neat and the right colour
- External lights, doorbell and outside socket working
- Meter boxes closed, undamaged and labelled
Roof, gutters and drainage
- Roof tiles or slates straight, none cracked, slipped or missing (look from the garden and street)
- Ridge and hip tiles fixed and mortar or dry-fix caps complete
- Lead flashings and soakers in place around chimneys, dormers and abutments
- Fascias and soffits fixed, undamaged and clean
- Gutters fixed, joints sealed, falling towards downpipes, free of debris
- Downpipes fixed to the wall and discharging into drains or gullies, not onto paths
- Gully grids and inspection chamber covers in place and level with paving
- Ventilation tiles or vents present where specified
Garden, drive and boundaries
- Drive and paths level, no cracked slabs, loose blocks or rocking edging
- Paving falls away from the house; no standing water by doors
- Steps even, with handrails where needed
- Fences complete, upright and the type and height shown on your plan
- Gates open, close and latch
- Turf laid evenly and topsoil free of building rubble (dig in a spade in a few places)
- Garden boundaries match the plot plan
- Outside tap working and not dripping
- Bin store and shed, if included, complete
Front door and entrance
- Door opens and closes without catching; no draughts around the edges
- Locks and multipoint mechanism work with every key supplied
- Letterbox, house number, spyhole and door chain fitted if specified
- Threshold sealed and not damaged; no daylight under the door
- Door finish free of scratches and dents
- Porch canopy fixed and sealed to the wall

Hall, stairs and landing
- Walls and ceilings flat and even in natural daylight from a couple of metres away
- No cracks, nail pops or patchy paint
- Stairs firm with no creaks, treads level, nosings undamaged
- Handrail and balustrade secure, with no wobble; spindle gaps consistent
- Smoke alarms fitted on each floor and working (press the test button)
- Under-stairs cupboard finished, door fitted, light working if specified
- Skirting boards and architraves fixed, mitres tight, caulked and painted
- Consumer unit (fuse board) accessible, labelled and with a cover
Kitchen
- Units level, doors and drawers aligned, closing softly where specified
- No chips or scratches on doors, worktops, plinths or end panels
- Worktop joints tight and sealed; sealant between worktop and wall continuous
- Sink and taps: hot and cold the right way round, no drips, drains quickly, no leaks underneath
- Hob, oven and extractor work; extractor vents outside if specified
- Appliances fitted as specified (check model numbers) and with manuals
- Tiling even, grout complete, no cracked tiles, cut tiles neat at edges
- Enough sockets as promised; all work; spur switches labelled
- Flooring laid flat, no lifting edges or gaps at thresholds
- Washing machine and dishwasher connections present and capped if not fitted
Utility room
- Units and worktop as kitchen: level, sealed, undamaged
- Sink, taps and waste work with no leaks
- Space and connections for washing machine and dryer; vent outlet for dryer if specified
- Extractor fan works
- Boiler or cylinder, if here, has clear access and its paperwork
Living, dining and other rooms
- Walls, ceilings and cornices flat and evenly painted; no cracks or nail pops
- Floors level (use the spirit level), no squeaks or bounce
- Internal doors open, close and latch without catching; gaps even all round
- Door handles, hinges and stops tight
- Windows open, close, lock and restrict where fitted; seals intact, no condensation between panes
- Window boards fitted and sealed; reveals finished
- Every socket and switch works; plates straight and undamaged
- TV, data and phone points present where shown on plans
- Radiators warm across the whole surface, valves work, no drips
- Fireplace or flue, if any, finished and with its certificate

Bedrooms
- Same checks as living rooms: walls, ceilings, floors, doors, windows, sockets, radiators
- Fitted wardrobes level, doors aligned, rails and shelves secure
- Escape windows on upper floors open wide enough and are not obstructed
- Carpet, if included, fitted tight to the skirting and joined neatly
- Loft hatch, if in a bedroom or landing, opens and closes and is draught-sealed
Bathrooms and en-suites
- Bath, shower tray, basin and WC firmly fixed; no movement when you sit or step in
- Sealant continuous around bath, shower tray, basin and worktops; no gaps or mould
- Taps run hot and cold the correct way, with good pressure; no drips
- Shower runs at an even temperature; screen or door sealed and closes properly
- Water drains quickly from bath, basin and shower; wet-room floors fall to the drain
- WC flushes fully, refills and stops; seat and lid secure
- No leaks under basins or behind bath panels (look with a torch)
- Tiling level, grout complete, no cracked or hollow tiles
- Extractor fan runs, including overrun after the light goes off if specified
- Shaver socket, lighting and heated towel rail work
- Bath panel fixed and access panel present for the waste trap
Loft
- Insulation laid evenly to the depth specified, with no gaps at the eaves or around the hatch
- Eaves ventilation not blocked by insulation
- No daylight through the roof covering; underlay intact
- Water tanks, if any, insulated with lids fitted
- Pipes in the loft lagged
- Boarding and loft ladder, if specified, fitted
- Extractor ducts connected to vents, not discharging into the loft
Garage
- Garage door opens, closes and locks smoothly; does not scrape the frame
- Remote controls, if electric, work
- Floor finished and free of large cracks
- Lights and sockets work
- Door from house to garage, if any, self-closing and fire-rated as specified
- Car charge point, if included, installed and documented
Services: electrics, plumbing and heating
Electrics
- Consumer unit labelled; RCD test button trips and resets
- Every socket tested with a tester or phone charger
- Every light works, including outside, cupboard and extractor lights
- Smoke and heat alarms present and working, interlinked if specified
- Carbon monoxide alarm fitted in any room with a fuel-burning appliance such as a boiler or stove
Plumbing
- Stopcock located, labelled and turns
- Water meter location known and reading taken
- Every tap and outlet run for a couple of minutes; no leaks or knocking pipes
- Hot water arrives at every tap within a reasonable time
Heating and hot water
- Boiler or heat pump runs; you have been shown how to use the controls
- Thermostat and programmer work; each radiator or underfloor zone heats
- Radiator valves turn and thermostatic heads respond
- Hot water cylinder, if any, heats and is labelled
- Gas meter reading taken
Windows and doors throughout
- Every window opens, closes and locks; keys supplied for each lock
- Trickle vents present and opening where fitted
- No scratches, cracked panes or failed seals (misting between panes)
- Restrictors fitted on upper-floor windows where specified
- Patio and bifold doors run smoothly, lock and seal with no draughts
- Internal doors: even gaps, no rubbing, latch catches, fire doors self-close where required
Paperwork and certificates
Ask for these at or before completion and keep copies. Exactly what you get varies with the home, the region and the developer.
- Warranty certificate and policy document (for example NHBC Buildmark, Premier Guarantee or LABC Warranty)
- Building regulations completion certificate, or confirmation of when it will follow
- Energy Performance Certificate
- Electrical installation certificate
- Gas safety and boiler commissioning records, if there is gas
- Heat pump or renewables commissioning and registration paperwork, if fitted
- Appliance manuals and guarantees
- Home user guide, including the developer's after-sales and emergency contacts
- Meter readings at completion (electricity, gas, water)
- Keys: count them against the list for every door and window
How to record what you find
- Tick or cross as you go. A cross on this checklist means a line on your snag list.
- Write each fault as one entry: room, exact spot, what is wrong. "Bathroom: silicone missing at tap end of bath, about 20 cm." See how to write snag entries.
- Take two photos: one wide to show where, one close to show what.
- Mark it on site with a small piece of masking tape if the developer is happy for you to, so trades can find it.
- Type it up the same day into a numbered list, using our snagging list template, and send it to the developer's after-sales team in writing.
Snagline, a phone app we are building, lets you take the photo first, add the room, trade and priority, and share a numbered PDF report without retyping. It is not released yet; you can join the waitlist below.
Common mistakes on a new build snag
- Inspecting at dusk or under artificial light, which hides plaster and paint faults.
- Rushing: a three-bedroom house deserves at least two hours.
- Skipping the outside and the loft because they are awkward.
- Not running water and heating, so leaks and cold radiators show up after you move in.
- Reporting faults verbally on site instead of in writing to the after-sales team.
Questions
What should I look for when snagging a new build?
Finish and fit in every room (walls, ceilings, floors, doors, windows, tiling, sealant), whether every service works (sockets, lights, taps, heating, extractor fans), and the outside: brickwork, roof, gutters, drainage, paving and fences.
How long does a new build snagging inspection take?
Allow two to three hours for a typical three-bedroom house in daylight, and less for a flat. Rushing is the most common reason faults are missed.
Is there an official new build snagging checklist?
The New Homes Quality Board publishes a standard Pre-Completion Inspection Checklist that must be used for pre-completion inspections under the New Homes Quality Code. This page is a practical checklist to use alongside it and after you move in.
When should I do my new build snagging?
Before legal completion if you can, after the developer serves notice to complete. Then again a few weeks after moving in, and before the second anniversary of completion.
Can I take a snagging inspector instead of doing it myself?
Yes. Under the New Homes Quality Code an inspector you appoint must belong to a recognised professional body, hold professional indemnity insurance and use the standard checklist.