Snagging list template: columns, a worked example and how to use it
A good snagging list template has ten columns: No., Location, Description, Trade, Priority, Photo ref, Reported, Due, Status and Signed off. Copy the layout below into Excel, Google Sheets or Word, write one snag per row, and send the list to your developer or contractor. A filled-in example with real snags follows the blank template.

The template
Copy this header row into a spreadsheet (one column each) or a landscape table in a document. Add a header block above it with the property address, plot number, developer or contractor, the date of inspection and who carried it out.
| No. | Location | Description | Trade | Priority | Photo ref | Reported | Due | Status | Signed off |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Open | ||||||||
| 2 | Open | ||||||||
| 3 | Open |
What each column is for
| Column | What to write | Example |
|---|---|---|
| No. | A unique number that never changes, even when the item is closed | 7 |
| Location | Floor and room, then the exact spot | First floor, bedroom 2, wall behind door |
| Description | One fault, in one plain sentence, with a measurement if it helps | Socket cover missing, wires visible |
| Trade | Who should fix it | Electrician |
| Priority | Critical, High, Medium or Low | High |
| Photo ref | Photo file name or number, so the picture and the row match | P07a, P07b |
| Reported | Date you sent it to the builder | 02/03 |
| Due | Date agreed for the fix | 16/03 |
| Status | Open, In progress, Fixed, Closed | Fixed |
| Signed off | Initials and date of the person who checked the fix | JM 18/03 |
Priority scale
- Critical: unsafe or causing damage now (leak, exposed wiring, loose balustrade). Phone it in as well.
- High: affects security, weathertightness or use (window will not lock, missing bath sealant).
- Medium: works but not properly (door catches, extractor fan not wired to the light).
- Low: cosmetic (paint runs, scuffs, small cracks).
Status meanings
- Open: reported, nothing done yet.
- In progress: the builder has accepted it and booked or started the work.
- Fixed: the trade says it is done.
- Closed: you have checked it and signed it off.
Keeping Fixed and Closed separate is the most useful habit in snagging. Items marked done that were never checked are where most disputes start.
Filled-in example
Here is the template completed for a three-bedroom new-build house, three weeks after a pre-completion inspection. Dates are day/month.
| No. | Location | Description | Trade | Priority | Photo ref | Reported | Due | Status | Signed off |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Kitchen, under sink | Drip from waste connection, cupboard base wet | Plumber | Critical | P01a, P01b | 02/03 | 04/03 | Closed | JM 05/03 |
| 2 | Lounge, rear window | Handle stiff, window will not lock closed | Windows | High | P02 | 02/03 | 09/03 | Fixed | |
| 3 | Bathroom, bath | Silicone missing at tap end, about 20 cm | Plumber | High | P03 | 02/03 | 09/03 | Closed | JM 10/03 |
| 4 | Bedroom 2, wall behind door | Socket cover missing, wires visible | Electrician | High | P04 | 02/03 | 04/03 | Closed | JM 05/03 |
| 5 | En-suite | Extractor fan does not run with the light | Electrician | Medium | P05 | 02/03 | 16/03 | In progress | |
| 6 | Kitchen, wall unit left of extractor | Door drops 4 mm at handle side, catches next door | Joiner | Medium | P06 | 02/03 | 16/03 | Open | |
| 7 | Bedroom 1, wardrobe wall | Uneven plaster patch, about 40 cm, visible in daylight | Plasterer | Medium | P07a, P07b | 02/03 | 23/03 | Open | |
| 8 | Landing, skirting | Paint run 30 cm left of bathroom door | Decorator | Low | P08 | 02/03 | 23/03 | Open | |
| 9 | Rear patio by back door | Standing water after rain, slabs fall towards house | Groundworks | High | P09 | 09/03 | 23/03 | Open | |
| 10 | Front elevation, below lounge sill | Mortar missing from bed joint, about 15 cm | Bricklayer | Medium | P10 | 09/03 | 23/03 | Open |
Note that item 2 is Fixed but not signed off: the window has been adjusted, but the buyer has not tried it yet. Items 9 and 10 were added a week later, with their own reported date, and keep the next numbers in sequence.

How to use the template
- Fill in the header: address, plot, builder, inspection date, your name.
- Walk the property in a fixed order: outside first, then each floor room by room. Our new build snagging checklist gives the order and what to check in each room.
- Write one snag per row. Two faults in one place are two rows, often for two different trades.
- Photograph every row. Name or number the photos to match the Photo ref column, so P07a is the wide shot and P07b the close-up of snag 7.
- Set priorities honestly. If everything is High, nothing is.
- Sort by trade before sending if the builder asks for it: one electrician can then clear all the electrical rows in one visit. Keep the numbers as they are.
- Update the status after each visit and send a fresh version, so there is only ever one current list.
For tips on wording each description, see how to write a snag list.
Making a printable version
A paper copy is handy on site, where typing on a laptop is awkward.
- Landscape A4, with the ten columns. Make Description the widest column, about a third of the page.
- Row height of about 2 cm so there is room to write by hand. Twelve to fifteen rows fit on a page.
- Repeat the header row on every page (in Excel: Page Layout, Print Titles; in Google Sheets: View, Freeze, 1 row, then print).
- Number rows in advance so you never skip or repeat a number.
- Add a footer with the address, page number and "Page x of y".
- Leave a sign-off box at the end: names, signatures and date for the inspector and the builder's representative.
- Type the list up afterwards. Handwritten lists are fine to work from but harder for a builder to process.
Sending the list to a developer or contractor
New-build homes
- Send it to the developer's after-sales or customer care team through the channel in your home user guide (portal, email or form), not to someone on site.
- Attach the photos, or a PDF with the photos next to each row.
- Ask for a reference number and keep the date you sent it.
- If the developer is registered with the New Homes Quality Code, they should settle most after-sales issues within 30 days; if a snag is not fixed within 30 days of reporting you can ask for it to go through their formal complaints procedure. Our guide to what snagging is explains the steps up to the New Homes Ombudsman Service.
Contractors and subcontractors
- Issue the list formally, with a date and revision number (Rev A, Rev B), to the contractor's site manager or project manager as your contract requires.
- Split or filter it by trade for subcontractors, but keep one master list.
- Agree target dates and when you will re-inspect.
- Record sign-off for each item; a fully closed list is useful evidence at practical completion and at the end of the defects period.

Spreadsheet tips
- Use drop-down lists (data validation) for Trade, Priority and Status so the values stay consistent and filter cleanly.
- Add conditional formatting to colour rows: red for Critical, and a highlight when the Due date has passed and Status is not Closed.
- Add a summary at the top: total items, number open, number overdue.
- Freeze the header row and the No. column.
- Store photos in a folder named after the property, with file names that start with the snag number.
Common mistakes with snag list templates
- Renumbering. Deleting closed rows and renumbering means "snag 12" in an email no longer matches the list. Never reuse a number; filter closed items out instead.
- Too few columns. A list with only Location and Description has no way to show what is overdue or who checked the fix.
- Too many columns. Cost codes, drawing references and three date fields make a homeowner's list hard to fill in. Add columns only when someone will use them.
- Vague locations. "Bedroom" in a three-bedroom house. Use the room names on the plans, then the exact spot.
- Several versions in circulation. Put a revision letter or date in the header and always send the full list, not just new items.
- Photos sent separately with no reference. Without the Photo ref column, a folder of thirty close-ups is little use to a builder.
Doing it on a phone instead
The template works on paper or in a spreadsheet. The weak point is always matching photos to rows. Snagline, a phone app we are building, does the template's job in one place: take the photo first, add location, trade, priority and due date, and the numbers, statuses and overdue flags are handled for you. It produces a PDF report with photos per item and a sign-off, and exports CSV for Excel. It is not released yet; join the waitlist below.
Questions
What columns should a snagging list template have?
No., Location, Description, Trade, Priority, Photo ref, Reported, Due, Status and Signed off. Add a header with the address, builder, inspection date and inspector.
Is there a free snag list template in Excel?
Copy the ten column headings on this page into Excel or Google Sheets and add drop-down lists for Trade, Priority and Status. That is all a snag list template needs.
How do I send a snagging list to my developer?
Use the after-sales channel in your home user guide, attach photos or a PDF with photos per item, ask for a reference number and keep the date you sent it.
Should I print my snagging list?
A printed copy is useful on site. Use landscape A4, leave room to write, repeat the headers on each page, then type the list up and send it in writing.
What is the difference between a snag list template and a punch list template?
They do the same job. Snag list is the UK term and punch list the US term; on US projects the punch list is usually tied to substantial completion and reviewed by the architect.