Site Audit Pro alternative: how Snagline compares
Site Audit Pro, by Veam Studios, is an established app for snag lists, audits and inspection reports, sold as a one-off £12.90 purchase with an optional Cloud subscription (as of November 2026). Snagline is a newer, not-yet-released alternative with a free plan, up to 3 photos per issue on that plan, floor-plan pins and three PDF layouts. Here is a factual side-by-side comparison.

Looking for Site Audit Pro?
If you came here looking for Site Audit Pro itself, it is made by Veam Studios Ltd and listed on the App Store and Google Play; its own website is siteauditpro.com. This page is written by the makers of Snagline, a different app. Snagline is not affiliated with Site Audit Pro or Veam Studios.
All Site Audit Pro details below are taken from its App Store listing and its website as of November 2026. Prices and features change, so check their listing before you decide.
Site Audit Pro in brief (as of November 2026)
- Price: the app is a one-off purchase of £12.90 on the UK App Store. Its pricing page says the iOS and Android apps are separate £12.90 purchases.
- Site Audit Pro Cloud (optional subscription): £6.99 a month or £59.99 a year. The site also sells Cloud seats to organisations.
- Platforms: iPhone, iPad and Apple Vision on the App Store, and Android on Google Play.
- Core features: issues with a title, assignee and comments; images you can annotate; projects with site and client details; optional timestamps and GPS locations on images; PDF and CSV reports shared by email, Dropbox and other methods.
- Report customisation: company name, logo, auditor name and signature; report wording adjustable for your industry; 8 report designs to choose from and customise.
- Cloud adds: a web app to view and edit projects and reports, multiple images per issue, sync across devices, folders, site address and project photo, due dates, marking issues and projects as completed, and custom report colour schemes.
Snagline in brief
- Status: not released yet. People join the waitlist; it will be on iPhone and Android.
- Free plan: up to 3 projects, up to 3 photos per issue, Classic PDF reports (with a small "Made with Snagline" line).
- Snagline Pro (subscription with a 7-day free trial): sync between devices, unlimited projects and photos, floor plans, logo and signature, all three report layouts, CSV export. No per-seat pricing. Prices are on the pricing page.
- Issues: numbered (drag to reorder and the numbers follow), with title, description, several photos, status (Open, In progress, Fixed, Closed), priority (Low, Medium, High, Critical), location, trade, assignee, due date with overdue flagged, and duplicate.
- Photos: camera-first "Snap issue"; mark up with pen, arrows, boxes, circles and text labels; optional timestamps and GPS location.
- Floor plans: add an image of a drawing and drop numbered pins coloured by status; tap a pin to open its issue.
- Reports: PDF in Classic, Bold and Compact layouts; cover with company details, logo and issue counts; filter by status; choose photos per issue; marked-up plans; signed sign-off. CSV for Excel.
- Offline: everything saved on the phone as you go; sign in with an emailed code to sync, with data stored in the UK/EU region.
Side-by-side comparison
| Site Audit Pro (as of November 2026) | Snagline | |
|---|---|---|
| Available now | Yes | No, waitlist |
| Up-front price | £12.90 one-off (iOS and Android bought separately) | Free plan |
| Subscription | Cloud: £6.99/month or £59.99/year | Pro: see pricing; 7-day free trial |
| Platforms | iPhone, iPad, Apple Vision, Android | iPhone, Android |
| Web app | Yes, with Cloud | No |
| Photos per issue | Multiple with Cloud | Up to 3 on the free plan; unlimited on Pro |
| Photo annotation | Yes | Yes: pen, arrows, boxes, circles, text |
| Timestamps and GPS on photos | Yes, optional | Yes, optional |
| Status, priority, due dates | Completion marking and due dates with Cloud | Four statuses, four priorities, due dates with overdue flag |
| Floor-plan pins | Not listed in its App Store description | Yes, on Pro |
| Report designs | 8, customisable; custom colours with Cloud | 3 layouts (Classic on free; all three on Pro) |
| Logo and signature | Yes | Yes, on Pro |
| CSV export | Yes | Yes, on Pro |
| Sync | With Cloud | With Pro |
| Team pricing | Cloud seats for organisations | No per-seat pricing |
Where Site Audit Pro is stronger
- It is available today. Snagline is not released yet. If you need an app this week, Site Audit Pro is a real option and Snagline is not.
- Long track record. It is an established app, at version 10.9 on the App Store as of November 2026.
- Web app. With Cloud you can view and edit projects and reports in a browser. Snagline has no web app.
- More report designs. 8 customisable designs and custom colour schemes, against Snagline's three layouts.
- iPad and Apple Vision. Its listing covers both; Snagline is a phone app.
- Adjustable report wording for different industries.
Where Snagline differs
- Free plan, no up-front price. You can run up to 3 projects and produce Classic PDF reports without paying.
- Several photos per issue on the free plan. Up to 3, so a close-up and a wider shot can sit on the same issue without a subscription.
- Floor-plan pins. Numbered pins on a drawing, coloured by status, that open the issue when tapped.
- Four statuses and four priorities on every issue, with overdue due dates flagged.
- One price for the team. No per-seat pricing on Pro.
- Three layouts (Classic, Bold, Compact) with status filters, photo choice per issue and marked-up plans in the report.

What to check whichever app you pick
- Do a mock inspection with the phone in flight mode and confirm photos are saved
- Add a close-up and a wider photo to one issue and mark them up
- Produce a PDF and check it reads well for your client: cover, counts, photos, signature
- Export a CSV and open it in Excel
- Check what happens to your data and photos if you stop paying
- Work out the yearly cost for the number of people who will use it
The PDF matters most: it is what your client sees, and it is the part of any inspection app that is hardest to judge from a feature list.
Which should you choose?
Choose Site Audit Pro if you need an app now, want a web app or iPad support, or want more report designs to choose from. Consider Snagline if you would rather start on a free plan, want several photos per issue without a subscription, or work from floor plans, and you are happy to wait for launch. Either way, do a mock inspection in flight mode and look at the PDF it produces before you commit. For a general guide to what an inspection app should do, see property inspection apps, or the inspection report template if you want to work without an app.
Questions
How much does Site Audit Pro cost?
As of November 2026, the app is a one-off £12.90 purchase on the UK App Store, and the optional Site Audit Pro Cloud subscription is £6.99 a month or £59.99 a year. Check its listing for current prices.
Is there a free alternative to Site Audit Pro?
Snagline has a free plan with up to 3 projects, 3 photos per issue and Classic PDF reports. It is not released yet; you can join the waitlist.
Is Site Audit Pro available on Android?
Yes. As of November 2026, Site Audit Pro's website links to a Google Play listing and says the iOS and Android apps are separate purchases.
Does Site Audit Pro have a web app?
Yes, with the Site Audit Pro Cloud subscription you can view and edit projects and reports from a web app, according to its App Store listing as of November 2026.
Is Snagline made by the same company as Site Audit Pro?
No. Snagline is made by Cloudconcur Ltd, a UK company, and is not affiliated with Site Audit Pro or Veam Studios.