Snagline
A female architect wearing a hard hat uses a tablet on a construction site for interior design planning

Snagging app for iPhone · Android to follow

Walk the site. Snap the snags. Send the report.

Snagline is the snag list, punch list and site audit app for people who do it every week: numbered issues with marked-up photos, pins on the floor plan, and a branded PDF before you leave site.

I use

One email when Snagline is ready to download, plus your free Pro trial. No newsletter. Privacy.

A project in Snagline: numbered issues with status, priority, due date and a photo
Free to start3 projects, no card
iPhone firstAndroid to follow
Works offlineBasements and new builds
No per-seat feesOne price per person

See a snag list made in 1:29

Add numbered issues, mark up photos, pin snags on the plan and send the PDF. Filmed in the app. More videos.

How to make a snag list on your phone (Snagline app walkthrough) · 1:29 · steps, captions and transcript on the video page

Everything a snag list needs, nothing it doesn’t

Built for snagging inspectors, site managers, contractors and developers’ customer care teams. The same app does UK snag lists, US punch lists, quality audits and health and safety walk-rounds.

Snap the issue first

Camera opens straight away. Take the photo, type a few words, move on. Every issue is numbered, and dragging one renumbers the list.

Mark up the photo

Arrows, boxes, circles, freehand and text labels, in colours that show on any wall. Your pen and line width stay as you left them.

Pin it on the plan

Add a floor plan and drop numbered pins coloured by status. Tap a pin to open the issue; the marked-up plan prints in the report.

Status, priority, trade, due date

Open, In progress, Fixed, Closed. Assign a trade or subcontractor, set a due date and see what is overdue at a glance.

Reports that look like yours

PDF with your logo, company details, issue counts, photos and signature, in three layouts. CSV for Excel when the QS asks.

Works with no signal

Everything saves on the phone as you go. Sign in and it syncs between phones and tablets when you are back online.

From walk-round to report on one phone

A project in Snagline: numbered issues with status, priority, due date and a photo
Numbered issues with status and photos
An issue in Snagline: photos, title, description, status and priority
Every issue: photos, status, priority, location
A floor plan in Snagline with numbered pins coloured by status
Pins on the floor plan
Sharing a report in Snagline: layout, status filters, photos per issue and sign-off
A branded PDF in three layouts

Snagging new builds

Room-by-room snag lists for pre-completion inspections and the developer’s two-year defects period. Number every snag, photograph it, and send the developer a report they can work through, then re-inspect and close each item.

Bright and spacious beige room with brown walls, large windows, and a wooden floor

Punch lists and site audits

Run the punch walk with the GC, owner and architect, assign each item to a sub, and track it to closed. Use the same projects for quality audits, health and safety inspections and site visit reports.

Confident female construction worker inspecting site with clipboard and helmet

Pricing

Free for up to three projects. Pro is £4.99 a month or £39.99 a year at launch: sync, unlimited projects and photos, floor plans, your logo and every report layout. Compare plans.

Guides and templates

All guides and templates

Questions

What is a snagging app?

A snagging app replaces the paper snag list: you photograph each defect, describe it, give it a location, trade and priority, then send a report to whoever has to fix it. Snagline also pins issues on floor plans and tracks them until they are closed.

Is Snagline for homeowners or contractors?

Both can use it, but it is built for people who snag for a living: site managers, contractors, developers’ customer care teams, clerks of works and snagging inspectors.

Does Snagline work offline?

Yes. Projects, issues and photos are saved on the phone as you go, so a basement or a site with no signal is fine. Sync catches up when you are back online.

Is Snagline on Android?

Not at launch. Snagline comes to iPhone first and Android follows; choose Android on the waitlist form and we will email you when it is ready. Projects will sync between the two.

How much does Snagline cost?

Free for up to three projects. Snagline Pro is £4.99 a month or £39.99 a year at launch, with a 7-day free trial and no per-seat pricing.

Can I use it for punch lists and site audits?

Yes. A punch list, a snag list and a site audit are the same job: numbered items with photos, a responsible party and a status, ending in a report. You can rename the report title to suit.