How to mark up snagging photos
Show exactly where each defect is: draw an arrow and a box on the photo, add a label and save it with the snag, ready for the snagging report.
In this video
Transcript
How to mark up snagging photos. Arrows, boxes and labels that show the trade exactly what to fix.
Several photos per issue. Add as many photos as you need from the camera or the library. Each one is time-stamped and kept with the issue.
Mark up the photo. Draw arrows, boxes, circles and freehand lines on the photo to show exactly where the defect is.
Your pen and colour are remembered. Add a text label, pick a colour and line width. The tool you used last is ready next time.
Saved with the issue. The marked-up photo replaces the original in the issue and the report. The original is kept, so you can redo the markup.
Describe the snag. Write what is wrong and what needs doing, the way you would say it to the trade: where it is, what is wrong, how big.
Priority, location and trade. Set the priority, pick the room or area, and add the trade and who is responsible so the list can be split and sent on.
Saved and numbered automatically. There is no save button: the issue is stored on the phone straight away and gets the next number on the list.
Marked-up photos in the report. Each issue prints with its marked-up photos, time-stamped, under a bar in its status colour.
Snagline: snag lists, punch lists and site audits. Free for up to 3 projects, on iPhone. Get it at snagline.app
More videos
How to make a snag list on your phone1:29 · Snag list app
Punch list app: add, track and close out items0:44 · Punch list app
Pin defects on floor plans0:27 · Defect tracking
How to create a site inspection report with photos0:42 · Inspection report
Free snagging list template: Word, Excel and PDF0:39 · Free template