Pin defects on floor plans
Add a floor plan from a PDF drawing or a photo, drop numbered pins for each defect, tap a pin to open it and print the plan with its pins in the PDF report.
In this video
Transcript
Pin defects on floor plans. PDF drawings or photos of plans, with numbered pins in status colours.
Add the floor plan: PDF or image. Add a drawing as a PDF page or a photo of the plan. A project can hold several plans, one per floor or area.
Numbered pins, coloured by status. Every issue pinned to the plan shows its number in its status colour, so the plan becomes a map of what is left to do.
Tap a pin to open the issue. Tap any pin to jump straight to that issue, with its photos, notes and who is fixing it.
Long-press to add an issue there. Long-press anywhere on the plan to create a new issue already pinned to that spot.
The pin goes in the report too. Plans print in the PDF report with the same numbered pins, so whoever fixes it can find it.
Plans print with their pins. The report includes each plan with its numbered pins, so the issue list and the drawing always agree.
Snagline: snag lists, punch lists and site audits. Free for up to 3 projects, on iPhone. Get it at snagline.app
More videos
How to make a snag list on your phone1:29 · Snag list app
Punch list app: add, track and close out items0:44 · Punch list app
How to mark up snagging photos0:38 · Snagging photos
How to create a site inspection report with photos0:42 · Inspection report
Free snagging list template: Word, Excel and PDF0:39 · Free template