Snagline

Free snagging list template: Word, Excel and PDF

Video · 0:39 ·

A tour of the free snag list, new-build snagging checklist and punch list templates (Word, Excel, PDF): what each column is for and how to fill them in.

In this video

  1. Free snagging list template
  2. The snag list template
  3. The new-build snagging checklist
  4. The punch list template
  5. Or do it on your phone
  6. Describe the snag
  7. Priority, location and trade
  8. Saved and numbered automatically
  9. Snagline: snag lists, punch lists and site audits

Transcript

Free snagging list template. Word, Excel and PDF. Free to download, no sign-up.

The snag list template. One row per snag: number, location, description, trade, priority, due date and status. Landscape, so it prints on one page.

The new-build snagging checklist. Room-by-room checks for a new home: walls, doors, windows, kitchen, bathroom, electrics, heating and outside.

The punch list template. The same idea for contractors: item, location, trade, responsible, due date and sign-off when each item is closed.

Or do it on your phone. Snagline keeps the same columns but adds photos, plan pins and a PDF report, with no typing up afterwards.

Describe the snag. Write what is wrong and what needs doing, the way you would say it to the trade: where it is, what is wrong, how big.

Priority, location and trade. Set the priority, pick the room or area, and add the trade and who is responsible so the list can be split and sent on.

Saved and numbered automatically. There is no save button: the issue is stored on the phone straight away and gets the next number on the list.

Snagline: snag lists, punch lists and site audits. Free for up to 3 projects, on iPhone. Get it at snagline.app

The video has no voice-over: the steps above appear on screen, with captions.

More videos