Final walkthrough checklist: what to check before you close on a new home
A final walkthrough is your last look at a new home before closing, usually a few days to 24 hours before you sign. Walk every room with this checklist, test everything that moves, opens, runs or switches on, and photograph each problem with blue tape beside it. Get the builder to agree the list in writing, with dates, before you close.

What the final walkthrough is for
On a new construction home the builder usually offers a walkthrough (some call it a blue-tape walk or a new home orientation) once the house is finished and the certificate of occupancy is in place. It is not the same as a home inspection. The inspection is done by a licensed inspector looking at systems and safety; the walkthrough is you, checking that the house you are buying is complete, clean and working, and that everything you chose is what was installed.
The walkthrough matters because it is the point where you still have leverage. Before closing, the builder wants the sale finished and will usually fix or agree to fix what you find. After closing you are relying on the builder's warranty and their warranty team's schedule. Anything you spot now and get written down is far easier to get done.
If you can, book an independent final inspection a few days before the walkthrough, then use the inspector's report as part of your list. Our guide to new construction home inspections explains the pre-drywall, final and 11-month inspections.
What to bring
- Blue painter's tape to mark every item on the wall, door or floor, so the builder's team can find it.
- Your phone for photos of each item with the tape in shot, and a charger for the outlets.
- A small lamp or a phone charger to test every outlet.
- A flashlight for closets, the attic hatch, under sinks and behind the water heater.
- Your contract, selections sheet and change orders, to check finishes, fixtures and options against what you paid for.
- This checklist, printed or on your phone (download the PDF, Word or Excel version above).
- Time: allow one to two hours for a typical house. Don't let the walk be rushed.
Outside
- Siding, brick and trim are complete, undamaged and painted
- Roof shingles lie flat; no missing or damaged shingles visible from the ground
- Gutters and downspouts are fitted and discharge away from the house
- Ground slopes away from the foundation; no standing water
- Driveway, walks and patio have no large cracks or trip edges
- Exterior doors open, close, latch and lock; weatherstrip is tight
- Garage door opens and closes; auto-reverse stops it when blocked
- Outside lights, outlets and hose bibs work
- Landscaping, sod and fencing match the contract
- AC condenser is level and its panel is intact
Kitchen
- Cabinet doors and drawers open, close and line up
- Countertops have no chips, cracks or loose seams
- Sink drains quickly; no leaks under the sink with the water running
- Faucet runs hot and cold; sprayer works
- Garbage disposal runs
- Dishwasher is secured to the counter and runs a short cycle without leaking
- Range, oven and hood fan work; hood vents outside if specified
- Fridge and other appliances are the models you chose and are undamaged
- Backsplash tile and grout are complete
- Countertop outlets work and are GFCI protected
Bathrooms
- Toilets flush, refill and are firm on the floor
- Sinks, tubs and showers drain; no leaks below
- Hot water reaches every fixture within a reasonable time
- Caulk is complete around tubs, showers and vanity tops
- Tile and grout have no cracks, gaps or lippage
- Shower door or curtain rod is fitted and closes properly
- Exhaust fan runs and pulls air
- GFCI outlets trip and reset
- Mirrors, towel bars and toilet roll holders are fitted firmly
Bedrooms and living areas
- Walls and ceilings have no dents, nail pops, cracks or patchy paint
- Flooring has no scratches, gaps, lifting edges or squeaks
- Carpet is stretched with no ripples or loose seams
- Interior doors open, close and latch without rubbing
- Closet doors, shelves and rods are fitted
- Windows open, close, lock and have screens; no cracked glass
- Every light switch works the right light
- Every outlet works (test with a lamp or charger)
- Smoke and carbon monoxide alarms are installed
- Baseboards and trim are complete, caulked and painted
Systems and utilities
- Heating and air conditioning both run; air flows from every register
- Thermostat controls the system
- Water heater is installed, strapped if required, and has a drain pan where needed
- Electrical panel breakers are labeled
- Laundry hookups, dryer vent and washer drain are in place
- Attic access opens; insulation looks evenly spread
- Doorbell, internet and TV outlets work
- Manuals, warranties, keys, garage remotes and codes are handed over
How to record what you find
Every item should be easy for the builder's crew to find without you there. For each one write the room, the exact spot, what is wrong and what fixed looks like, then take a photo with the blue tape in shot.
| # | Location | Item | Photo | Agreed fix | Fixed by |
|---|---|---|---|---|---|
| 1 | Primary bath | Caulk missing at tub-to-tile corner, left side | IMG_0412 | Recaulk | Before closing |
| 2 | Kitchen | Upper cabinet door left of range sits 1/4 in. low | IMG_0415 | Adjust hinges | Before closing |
| 3 | Bedroom 2 | Carpet seam lifting at doorway | IMG_0421 | Re-stretch and seam | Within 30 days |
| 4 | Garage | Door does not reverse when blocked | IMG_0430 | Adjust sensors and force | Before closing |
Number the items and keep the numbering for the whole process, so "item 3" means the same thing to you, the builder and the warranty team.
Before you sign: getting the list agreed
- Ask for a written copy of the list, signed or emailed by the builder's representative, with a date for each item.
- Separate safety and function from cosmetic items. A garage door that won't reverse, a missing GFCI or a leak should be fixed before closing; a paint touch-up can wait if it is written down.
- Re-walk before closing if items were due to be finished first, and check them off one by one.
- Check what your contract says about holdbacks or escrow for unfinished work. Practice varies by builder, lender and state, so ask your agent or attorney rather than assuming.
- Keep the list. Items noted at the walkthrough are your evidence later if something wasn't done, and the start of your 11-month warranty list.
Common mistakes
- Walking with the sales agent only. Ask for the construction manager or superintendent, who can commit to fixes.
- Not testing things. Looking at a dishwasher tells you nothing; running it for ten minutes does.
- Vague notes. "Paint bad in hallway" will be argued about. "Hallway, right wall by the linen closet: roller marks and a patch of different sheen" will be fixed.
- Letting it be rushed because the movers are booked. A finished list is worth an hour.
Snagline does the recording part on a phone: each item gets a number, a marked-up photo and a status, and you can send the builder a PDF of the open items before you leave. The checklist above works just as well on paper.
Questions
When is the final walkthrough on a new construction home?
Usually a few days before closing, once the house is finished. Many builders hold an orientation walk first and a final check of agreed items shortly before closing.
How long does a final walkthrough take?
Plan on one to two hours for a typical house, longer for a large home or if you are testing every appliance and outlet.
Is a final walkthrough the same as a home inspection?
No. A home inspection is a professional assessment of the home's systems and condition. The walkthrough is the buyer checking the home is complete and matches the contract. On new construction it is worth doing both.
What happens if problems are found at the final walkthrough?
Write each one down with a photo and get the builder to agree in writing what will be fixed and by when. Safety and function items should be fixed before closing; how unfinished work is handled at closing depends on your contract and lender.
What should I bring to a final walkthrough?
Blue painter's tape, your phone for photos, a charger or small lamp to test outlets, a flashlight, your contract and selections sheet, and this checklist.